KPI

Communication Clarity Micro‑Sprint — Final Assembly

Improve FPY, cut Scrap, reduce incidents — by fixing how people communicate

A 6‑week on‑floor sprint that rewrites your 10 most critical SOPs, installs read‑back on handovers, and adds one dropdown + one checkbox to your systems. Language‑enabled (EN/SI), factory‑ready.

Slovene: V 6 tednih izboljšamo kakovost in varnost z jasnimi navodili, potrditvijo prevzema dela in minimalnimi spremembami v sistemih.

FPY

95.2%

+4.2 pp

Scrap %

−12.7%

better

TRIR

↓ 22%

trend

Read‑back

96%

≥ 95% target

One dropdown + one checkbox → clean weekly data → BI page that proves Safety‑Quality‑Delivery gains.

Ambiguous SOPs

→ RFT/FPY ↑

+3–5 pp

Handover gaps

→ TRIR ↓

−15–30%

Spec/label confusion

→ Scrap ↓

−10–15%

Slow ramp

→ TtI ↓

−20%

How it works

  1. Baseline & tags

    Add COMM_* dropdown + read‑back checkbox; snapshot FPY / Scrap / TRIR / TtI.

  2. Rewrite & install

    10 one‑page SOPs (visual, bilingual EN/SI). Read‑back on 4 critical handovers.

  3. Coach & prove

    Short floor coaching. Weekly BI page. Week‑6 before/after memo and ROI.

What you get

  • 10 one‑page SOPs (EN/SI), press‑ready PDFs + source files
  • Read‑back kit & handover sheets (laminated A5/A4)
  • COMM_* cause codes and field definitions
  • Power BI page + before/after KPI memo

Pricing

Pilot (6 weeks)

€8k–€12k

Single value stream in Final Assembly.

Scale per line

€5k–€9k

Repeat of proven playbook.

Optional add‑ons

  • Supervisor micro‑workshops (4×60 min)
  • Supplier doc/label clarity pass (top 3 suppliers)

Intra‑EU B2B reverse charge (Art. 44/2006/112/EC). VAT handled per directive.

FAQs

Is this a language course?

No. It’s an operations sprint that happens to be language‑enabled (EN/SI).

Do we need IT?

Minimal—one dropdown and one checkbox. Paper/SharePoint works for pilots.

Does this clash with Lean/Six Sigma?

No—this removes communication‑caused variation and complements your system.

Scroll to Top